
11. Verify that the ground strap is fastened to the 2105 Expansion Enclosure frame with lock washers
between both cable terminals and the frame
18
.
Note: The ground strap may be fastened to the left side of the 2105 Expansion Enclosure frame in
the same position.
PPS 2
PPS 1
Rear View
16
17
2105 Expansion Enclosure
Figure 88. 2105 Expansion Enclosure, Primary Power Supply Ground Jumpers (S008376q)
2105 Expansion Enclosure Safety Inspection
Safety Check, CHAPTER 12
207
Summary of Contents for E10
Page 2: ......
Page 68: ...52 VOLUME 3 ESS Service Guide...
Page 192: ...2105 Exception Symptom Codes 176 VOLUME 3 ESS Service Guide...
Page 198: ...Translation 182 VOLUME 3 ESS Service Guide...
Page 256: ...CPI Diagnostic Progress Code Stop 240 VOLUME 3 ESS Service Guide...
Page 257: ...CPI Diagnostic Progress Code Stop Appendix C Isolating a CPI Diagnostic Progress Code Stop 241...
Page 258: ...CPI Diagnostic Progress Code Stop 242 VOLUME 3 ESS Service Guide...
Page 259: ...Glossary of Terms and Abbreviations Copyright IBM Corp 1999 2000 243...
Page 277: ......
Page 279: ...Spine information Enterprise Storage Server VOLUME 3 ESS Service Guide...