
Table 10. SP Checkpoints. (continued)
Checkpoint
Description
Action/ Possible Failing FRU
E241
Reset PCI bus
I/O Planar, see 1 on page 100
E242
Initialize ISA DMA channel
I/O Planar, see 1 on page 100
E243
Setup grackle configuration registers
I/O Planar, see 1 on page 100
E244
Enable system speaker and send a beep!
I/O Planar, see 1 on page 100
E246
System firmware corrupted, take recover
path
I/O Planar, see 1 on page 100
E247
Capture DIMM SPDs into NVRAM
I/O Planar, see 1 on page 100
E249
Enter recover paths main code
I/O Planar, see 1 on page 100
E24C
L2 cache array test fails, system hangs
I/O Planar, see 1 on page 100
E24D
L2 cache array test fails, system hangs
I/O Planar, see 1 on page 100
E297
Start firmware softload path execution
See 1 on page 100
E298
Start firmware recovery path execution
See 1 on page 100
E299
Start C code execution
See 1 on page 100
E600
SSA PCI adapter open firmware has run
successfully
SSA card, identify the adapter by using
″
MAP
4540: Cluster Minimum Configuration
″
in
chapter 3 of the Enterprise Storage Server
Service Guide, Volume 1 to isolate the failing
SSA card
E601
SSA PCI adapter BIST has been started but
failed to complete after four seconds
See Action/Possible Failing FRU with
Checkpoint E600
E602
SSA PCI adapter open firmware has started
See Action/Possible Failing FRU with
Checkpoint E600
E603
SSA PCI adapter BIST has completed with
an error
See Action/Possible Failing FRU with
Checkpoint E600
E604
SSA PCI adapter BIST and following POSTs
have completed successfully
See Action/Possible Failing FRU with
Checkpoint E600
E605
SSA PCI adapter BIST has completed
successfully, the following POSTs have failed
See Action/Possible Failing FRU with
Checkpoint E600
E60E
SSA PCI adapter open firmware about to
exit (no stack corruption)
See Action/Possible Failing FRU with
Checkpoint E600
E60F
SSA PCI adapter open firmware has run
unsuccessfully
See Action/Possible Failing FRU with
Checkpoint E600
E6FF
SSA PCI adapter open firmware about to
exit (with stack corruption)
See Action/Possible Failing FRU with
Checkpoint E600
F0FF
Service processor firmware fail
See “Firmware/POST Error Codes” on
page 73 for 4BA10004
OK
SP Ready Waiting for Power-On
None, Normal operation
READY
SP Cluster Bay may be powered off if
CD-ROM tray does not open when the eject
button is pressed
None, Normal operation
STBY
SP Ready, system was shutdown by the
operating system and is still powered on
This condition can be requested by a
privileged system user with no faults. See SP
error log for possible operating system fault
indications.
Codes
104
VOLUME 3, ESS Service Guide
Summary of Contents for E10
Page 2: ......
Page 68: ...52 VOLUME 3 ESS Service Guide...
Page 192: ...2105 Exception Symptom Codes 176 VOLUME 3 ESS Service Guide...
Page 198: ...Translation 182 VOLUME 3 ESS Service Guide...
Page 256: ...CPI Diagnostic Progress Code Stop 240 VOLUME 3 ESS Service Guide...
Page 257: ...CPI Diagnostic Progress Code Stop Appendix C Isolating a CPI Diagnostic Progress Code Stop 241...
Page 258: ...CPI Diagnostic Progress Code Stop 242 VOLUME 3 ESS Service Guide...
Page 259: ...Glossary of Terms and Abbreviations Copyright IBM Corp 1999 2000 243...
Page 277: ......
Page 279: ...Spine information Enterprise Storage Server VOLUME 3 ESS Service Guide...