Chapter 3 • Commissioning the HX200 satellite router
1038054-0001 Revision B
53
28. Click
Continue
on the Registration Welcome screen that
appears.
29. Click
Continue
on the Registration screen to download
configuration parameters to the satellite router.
30. Click
Restart
on the Registration Complete screen to restart
the satellite router.
31. To complete the commissioning process, close the Terminal
Reset screen.
The satellite router resets and is now commissioned.
Continue with Chapter 4 –
Completing the installation,
on
page 55.
Figure 37: Registering a satellite router (enterprise user) – entering site ID
Summary of Contents for HX200
Page 1: ...1038054 0001 Revision B July 7 2011 HX System HX200 Satellite Router Installation Guide ...
Page 10: ... Contents x 1038054 0001 Revision B ...
Page 20: ...Chapter 1 Introduction 10 1038054 0001 Revision B ...
Page 30: ...Chapter 2 Assembling and connecting HX200 hardware 20 1038054 0001 Revision B ...
Page 64: ...Chapter 3 Commissioning the HX200 satellite router 54 1038054 0001 Revision B ...
Page 70: ...Chapter 4 Completing the installation 60 1038054 0001 Revision B ...
Page 100: ...Chapter 5 The System Control Center 90 1038054 0001 Revision B ...
Page 130: ...Appendix B Updating the satellite router software 120 1038054 0001 Revision B ...
Page 134: ...Appendix C Disabling a Web browser proxy connection 124 1038054 0001 Revision B ...
Page 138: ...Appendix D Azimuth antenna setting and software version 128 1038054 0001 Revision B ...
Page 142: ...Appendix E Seatel antenna settings and software version 132 1038054 0001 Revision B ...
Page 147: ...Appendix G LNB selection reference 1038054 0001 Revision B 137 ...
Page 148: ...Appendix G LNB selection reference 138 1038054 0001 Revision B ...
Page 154: ...Appendix H Conforming with standards and directives 144 1038054 0001 Revision B ...