Chapter 1 • Introduction
10
1037106-0001 Revision B.03-Draft
– Assembling and adjusting the antenna
– Connecting component cables
– Powering up and observing remote terminal LEDs
•
Commissioning the remote terminal (
) using one
of the following methods:
– Satellite-based commissioning
– Dial-up commissioning
– Manual commissioning
•
Completing the installation (
):
– Confirming that all files are current
– Connecting the remote terminal to the customer’s
computer
– Connecting serial devices to the remote terminal
– Printing the System Information page (may not be required
for International or enterprise customers)
– Creating a shortcut to the System Control Center (may not
be required for International or enterprise customers)
Summary of Contents for HX100
Page 12: ... Figures xii 1037106 0001 Revision B 03 Draft ...
Page 14: ... Tables xiv 1037106 0001 Revision B 03 Draft ...
Page 34: ...Chapter 2 Preparing for the Installation 16 1037106 0001 Revision B 03 Draft ...
Page 42: ...Chapter 3 Installing the Hardware 24 1037106 0001 Revision B 03 Draft ...
Page 60: ...Chapter 4 Commissioning the HX50 HX100 Remote Terminal 42 1037106 0001 Revision B 03 Draft ...
Page 68: ...Chapter 5 Completing the Installation 50 1037106 0001 Revision B 03 Draft ...
Page 86: ...Chapter 6 Troubleshooting 68 1037106 0001 Revision B 03 Draft ...
Page 106: ...Chapter 7 The System Control Center 88 1037106 0001 Revision B 03 Draft ...
Page 128: ...Appendix C Disabling a Web browser s proxy connection 110 1037106 0001 Revision B 03 Draft ...