Power Line Carrier ____________________________________________________________________
RF-MCGARDPRO
Hubbell Power Systems, Inc.
–
RFL™
Products
July 1, 2022
©2022 Hubbell Incorporated
5-41
3.
Verify that jumpers J16 through J20 are installed.
J16
J17
L4
J18
J19
J20
Figure 5-21. PLC Verifying Jumpers J16 through J20
4.
Verify that jumper J24 is set to “Isolate”.