Installation __________________________________________________________________________
RF-MCGARDPRO
Hubbell Power Systems, Inc.
–
RFL™
Products
July 1, 2022
©2022 Hubbell Incorporated
3-2
3.
Make sure all modules are fully seated in the chassis. The machine screws securing all
I/O modules to the rear of the chassis should be fully tightened.
3.3
Mounting
After unpacking, HPS/RFL GARD Pro system equipment must be securely mounted, following
the instructions in the following paragraphs. Use the procedure that suits your equipment:
-
individual chassis
-
interconnected chassis installed in racks or cabinets
-
interconnected chassis mounted on shipping rails
3.3.1 Individual Chassis
HPS/RFL GARD Pro system terminals housed in individual chassis have two mounting ears (one
on each side). Hole sizes and spacing’s conform with EIA standards so the HPS/RFL GARD Pro
system can be mounted in any standard 19-inch rack or cabinet. Complete mounting dimensions
are shown in the following figure.