No.
Check That
Check Result
3
The flat washers and spring washers of all wiring
terminals are securely installed.
□ Passed □ Failed
4
Cables are bound neatly and cable ties are
secured evenly and properly.
□ Passed □ Failed
5
Routed cables should be convenient for future
maintenance and expansion.
□ Passed □ Failed
6
All labels at the cable ends are clear.
□ Passed □ Failed
7
The excess section of a cable strip is cut evenly.
□ Passed □ Failed
8
There is no unnecessary adhesive tape or cable tie
on cables.
□ Passed □ Failed
Electrical Installation Check
Table 4-17 Electric installation check items
No.
Check That
Check Result
1
All ground cables are copper cables. Cable
diameters are correct. No switches or fuses are
installed on the cables and no short circuit occurs.
□ Passed □ Failed
2
The ground cable, AC power cables, and internal
cables are correctly connected and screws are
secured. No short circuit occurs during power
input or output.
□ Passed □ Failed
3
The smart cooling product input voltage is within
the range of rated voltage ±10%, and the input
frequency is within the range of rated frequency
±3 Hz.
□ Passed □ Failed
4
The length of ground cables and power cables is
correct.
□ Passed □ Failed
5
Lugs for power cables and PGND cables are
soldered or crimped securely.
□ Passed □ Failed
6
Power cables and PGND cables are routed and
bundled separately from other cables.
□ Passed □ Failed
7
Lithium batteries are intact, free from damage,
cracks, and bulges.
□ Passed □ Failed
8
Lithium batteries are neat and clean, and do not
leak electrolyte.
□ Passed □ Failed