Rack Flange Kit for
Swept CW Generators
Option 913 swept CW generators are supplied with rack flanges and
the necessary hardware to install them on the swept CW generator
with Handles Attached
without removing the instrument handles. The following table
(Option 913)
itemizes the parts in this kit.
Table 3-6.
Rack Flange Kit for Swept CW Generators with Handles
Attached Contents
CAUTION
Ventilation Requirements:
When installing the instrument in a
cabinet, the convection into and out of the instrument must not be
restricted. The ambient temperature (outside the cabinet) must be
less than the maximum operating temperature of the instrument
by 4
for every 100 watts dissipated in the cabinet. If the total
power dissipated in the cabinet is greater than 800 watts, then forced
convection must be used.
Installation 3-15