GRIDSTORE ADMINISTRATOR’S GUIDE 105
Managing the Grid
At the Grid level, you can modify IP addresses for all the Gridstore Storage Nodes in the Grid,
upgrade software for the entire Grid, check status information on all elements of the Grid and more.
This section covers the following topics:
Adding Gridstore Storage Nodes to an Existing Grid
Modifying IP Addresses for all Gridstore Storage Nodes in the Grid
Shutting Down the Grid
Starting Up the Grid
Upgrading Software for the Grid
Removing Software from the Grid
Restarting the Management Service
Checking Status Information for the Entire Grid
Adding Gridstore Storage Nodes to an Existing Grid
If you would like to add one or more Gridstore Storage Nodes to an existing Grid, you need to first set
up the Gridstore Storage Nodes in your datacenter (rack-mount, connect and power them on), and
then configure them.
This sub-section covers the following topics:
Setting Up Gridstore Storage Nodes in Your Datacenter
Configuring Gridstore Storage Nodes
Setting Up Gridstore Storage Nodes in Your Datacenter
In this step, you will rack mount, connect and power on the Gridstore Storage Nodes that you are
adding to an existing Grid.
Note:
If you are setting up your Grid for the first time, see
(on pg. 7) instead.
Note that each Gridstore Storage Node comes ready to rack mount. As you follow the steps, refer to
the images below.