Preface
About this manual
This service manual provides the information
needed to install the AK 95 or AK 95 S
monitor and how to carry out maintenance
and calibrations.
It is a guidance how to identify and repair
faults that may occur.
All information, texts and figures, are valid
for AK 95 S. If the information is specific for
AK 95 only, it is stated in the corresponding
text.
Installation
Installation of the machine should be done in
accordance with the recommended procedures
in the Installation Guide.
When installing a new monitor kindly
remember to fill out the Installation / Out of
Box report and return it to:
Gambro Lundia AB
Monitor Division
Magistratsvägen 16
PO Box 10101
SE-220 10 Lund
Sweden
This is an important information and it will
assist us to improve the product for you. The
Out of Box system is not valid for products,
components or printed circuit boards that
isn't in its original delivered condition.
Complaint
If a complaint is raised it shall be
communicated to the relevant Gambro Sales
Company. In order for the Sales Company to
be able to determine the relevance of a
complaint, it is of vital importance that the
deviation is communicated to them as
comprehensive as the issue requires.
Complaints are important information and it
will assist Gambro to improve the product for
you. The Complaint system is not valid for
products, components or printed circuit
boards that isn't in its original delivered
condition.
Disclaimer
The manufacturer accepts responsibility for
the safety, reliability, and performance of this
equipment only if installation, operational
procedures, maintenance, calibrations, and
repairs are carried out by appropriately
trained and suitable qualified people; if all
equipment modifications are authorized in
writing by the manufacturer and carried out
by appropriately trained and suitable
qualified people; if the electrical installation
of the relevant room complies with all
applicable local electrical codes and, if
applicable, IEC requirements; and if the
equipment is used in accordance with the
published Operator’s Manual.
Maintenance
To ensure proper operation of the AK 95 /
AK 95 S, a qualified service technician must
perform a complete series of maintenance
procedures at regular intervals.
The maintenance and calibration information
that you need to use is provided in this
Service Manual.
It is mandatory to perform at least a
preventive maintenance every second year.
A yearly maintenance is recommended. The
rate of preventive maintenance might be
different due to variations of the operating
environment.
Competence of Service Engineers
There is a certain minimum level of
competence required for Service Engineers
who are to maintain and repair Gambro
products, summarized as follows.
A Service Engineer is considered suitable
qualified if he/she has:
1. Practical experience of the AK 95 S
monitor.
2. Attended AK 95 S technical service course
and has been given a certificate stating
that the technician has passed the course.
3. Access
to
the
recommended test
equipment and special tools detailed in
this Service Manual.
4. Access to the recommended spare parts,
see section Spare Parts List.
5. Access to and understanding of the
AK 95 S Operator's Manual, HCEN9794
or AK 95 Operator's Manual, HCEN9542.
In general, this policy implies that training
will be carried out by Gambro Lundia AB:
Monitor Division, while local markets are
responsible for their own service
organization.
Summary of Contents for AK 95
Page 1: ...AK 95 AK 95 S Service Manual A better way to better care ...
Page 5: ...This page is intentionally left blank ...
Page 6: ...Installation Guide AK 95 AK 95 S January 2004 ...
Page 7: ......
Page 20: ......
Page 102: ...Maintenance Manual AK 95 AK 95 S October 2006 GAMBRO ...
Page 103: ......
Page 125: ...5 22 MaintenanceManual AK95 AK95SHCEN12189Rev 10 2006 This page is intentionally left blank ...
Page 126: ......
Page 152: ...Spare Parts List AK 95 AK 95 S October 2005 ...
Page 153: ......
Page 159: ...HCEN9094Rev 10 2005 7 3 Operator s panel 9 1 3 4 5 6 5 7 5 2 8 6 6 8 ...
Page 161: ...HCEN9094Rev 10 2005 7 4 Blood pump 10 2 8 3 5 9 4 7 1 6 11 12 ...
Page 163: ...HCEN9094Rev 10 2005 7 5 Blood pump Motor unit 8 7 6 9 2 10 3 4 5 1 11 ...
Page 165: ...HCEN9094Rev 10 2005 7 6 Heparin pump 1 2 3 4 5 6 8 7 ...
Page 169: ...HCEN9094Rev 10 2005 7 8 Magnetic Clamp unit 1 2 3 7 8 12 16 4 5 6 9 10 11 17 18 14 13 19 15 ...
Page 181: ...HCEN9094Rev 10 2005 7 13 Heater Flow guard 3 9 1 2 10 4 8 7 11 12 13 5 6 3 ...
Page 189: ...HCEN9094Rev 10 2005 Protective Protective 7 17 Boards 7 1 2 9 6 5 4 3 8 ...
Page 191: ...HCEN9094Rev 10 2005 1 7 18 Rear box 6 3 7 5 4 2 ...
Page 195: ...HCEN9094Rev 10 2005 T12AH 250AC BACH BACO HALT 7 20 AC DC 2 4 5 1 6 7 8 9 3 ...
Page 205: ...HCEN9094Rev 10 2005 7 25 MM I O board 3 2 9 4 6 7 8 5 1 10 ...
Page 215: ...HCEN9094Rev 10 2005 7 30 UFD Option 4 5 7 17 12 9 6 18 1 6 11 16 8 10 6 13 14 3 2 6 19 15 ...
Page 219: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Page 221: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Page 224: ......
Page 225: ...9 1 HCEN9160 Revision10 2005 Service Manual Symbols Chapter9 SymbolDescription ...
Page 228: ...9 4 HCEN9160Revision10 2005 Service Manual Symbols Thispageisleftintentionallyblank ...
Page 234: ...Replacements 10 6 AK 95 AK95SHCEN12078Rev 10 2005 This page is intentionally left blank ...
Page 247: ...AK 95 AK 95 S Service Manual ...