5:12
Maintenance Manual
AK 95 / AK 95 S
HCEN12189 Rev.10
. 2006
Base-kit
21.
Start the machine using the following
settings: Suitable mode (Acetate or
Bicarbonate) UF
Temperature 37 °C
Conductivity 14 mS/cm
22.
Run the machine for at least 30 minutes
with the fluid passing through the
measuring cell of the Reference Instru-
ment before continuing with the check of
functions and calibrations. Meanwhile,
check the fluid path for air leakages, fluid
leakages and salt deposits.
23.
Adjust the second pressure regulator to
120-125 mmHg, before the heater,
according to the Service Manual.
24.
Turn off the power supply main switch.
Disconnect the silicone T-connector.
Note!
Be careful when opening the fluid
tubes. Put a piece of paper around the tube
connector to avoid leakage inside the
monitor.
25.
Turn on the power supply main switch
again and start the AK 95 S.
26.
Check the conductivity indications, at
approximately 14 mS/cm.
Use GXL - fluid monitor screen and a
reference instrument connected to the
dialysis fluid tubes.
The indicated conductivity values (for
cond.cell P) in GXL should correspond to
the indication on the reference instru-
ment. The maximum deviation is ±0.3 mS/
cm.
27.
Check the temperature indications, at
approximately 37 °C.
Use GXL - fluid monitor screen and a
reference instrument connected to the
dialysis fluid tubes.
The indicated temperature value (at the
conductivity cell P) should correspond to
the indication on the reference instru-
ment. The maximum deviation is ±1.5 °C.
If the deviation is more than the stated
tolerance; the affected temperature
transducer must be exchanged.
28.
Perform a full calibration of the UF-cell
according to the Service manual.
29.
Place the blood monitor on the fluid
monitor. Let the machine pass Fch.
30.
Start the heparin pump.
31.
Check the DC leakage between TP 5
(Z0VL) on the Control CPU board and the
metal on the heater rod. Measure in DC
Voltage, should be < 1 V.
32.
Place the blood monitor on the sideboard.
33.
Check the DC leakage between TP 5
(Z0VL) on the Control CPU board and the
cover of the suction pump motor. Measure
in DC Voltage, should be < 1 V.
34.
Check the DC leakage between TP 5
(Z0VL) on the Control CPU board and the
cover of the degassing pump motor.
Measure in DC Voltage, should be < 1 V.
35.
Check the DC leakage between TP 5
(Z0VL) on the Control CPU board and the
suction pump head. Measure in DC
Voltage, should be < 1 V.
36.
Check the DC leakage between TP 5
(Z0VL) on the Control CPU board and the
degassing pump head. Measure in DC
Voltage, should be < 1 V.
Summary of Contents for AK 95
Page 1: ...AK 95 AK 95 S Service Manual A better way to better care ...
Page 5: ...This page is intentionally left blank ...
Page 6: ...Installation Guide AK 95 AK 95 S January 2004 ...
Page 7: ......
Page 20: ......
Page 102: ...Maintenance Manual AK 95 AK 95 S October 2006 GAMBRO ...
Page 103: ......
Page 125: ...5 22 MaintenanceManual AK95 AK95SHCEN12189Rev 10 2006 This page is intentionally left blank ...
Page 126: ......
Page 152: ...Spare Parts List AK 95 AK 95 S October 2005 ...
Page 153: ......
Page 159: ...HCEN9094Rev 10 2005 7 3 Operator s panel 9 1 3 4 5 6 5 7 5 2 8 6 6 8 ...
Page 161: ...HCEN9094Rev 10 2005 7 4 Blood pump 10 2 8 3 5 9 4 7 1 6 11 12 ...
Page 163: ...HCEN9094Rev 10 2005 7 5 Blood pump Motor unit 8 7 6 9 2 10 3 4 5 1 11 ...
Page 165: ...HCEN9094Rev 10 2005 7 6 Heparin pump 1 2 3 4 5 6 8 7 ...
Page 169: ...HCEN9094Rev 10 2005 7 8 Magnetic Clamp unit 1 2 3 7 8 12 16 4 5 6 9 10 11 17 18 14 13 19 15 ...
Page 181: ...HCEN9094Rev 10 2005 7 13 Heater Flow guard 3 9 1 2 10 4 8 7 11 12 13 5 6 3 ...
Page 189: ...HCEN9094Rev 10 2005 Protective Protective 7 17 Boards 7 1 2 9 6 5 4 3 8 ...
Page 191: ...HCEN9094Rev 10 2005 1 7 18 Rear box 6 3 7 5 4 2 ...
Page 195: ...HCEN9094Rev 10 2005 T12AH 250AC BACH BACO HALT 7 20 AC DC 2 4 5 1 6 7 8 9 3 ...
Page 205: ...HCEN9094Rev 10 2005 7 25 MM I O board 3 2 9 4 6 7 8 5 1 10 ...
Page 215: ...HCEN9094Rev 10 2005 7 30 UFD Option 4 5 7 17 12 9 6 18 1 6 11 16 8 10 6 13 14 3 2 6 19 15 ...
Page 219: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Page 221: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Page 224: ......
Page 225: ...9 1 HCEN9160 Revision10 2005 Service Manual Symbols Chapter9 SymbolDescription ...
Page 228: ...9 4 HCEN9160Revision10 2005 Service Manual Symbols Thispageisleftintentionallyblank ...
Page 234: ...Replacements 10 6 AK 95 AK95SHCEN12078Rev 10 2005 This page is intentionally left blank ...
Page 247: ...AK 95 AK 95 S Service Manual ...