4:11
AK 95 / AK 95 S Service Manual
HCEN 9136 Rev. 10.2005
Service Technicians Guide
Presetable parameters in Autopriming
0
Auto priming install
Installed / Not installed
1
Auto priming fill flow
0 - 500 ml/min
This is the initial flow rate when
filling the dialyzer and blood lines.
2
Auto priming fill time
0 - 300 s
This is the time for filling the dialyzer
and blood lines completely.
3
Auto priming press build time
0 - 30 s
The venous clamp closes. This is the time for
building up the venous pressure alarm limit.
4
Auto priming press drop time
0 - 60 s
The measurement time for the pressure
drop when performing the leakage test
of the dialyzer.
5
Auto priming press drop
0 - 100 mmHg
The acceptable pressure drop when per-
forming the leakage test of the dialyzer.
6
Auto priming prim flow
0 - 500 ml/min
This is the flow rate during the priming
phase as well as during the flushing phases.
7
Auto priming prim time
0 - 600 s
This is the required time for the priming
phase.
8
Auto priming cycle time
0 - 60 s
This time specifies the opening and closing
time of the venous clamp during the priming
phase.
9
Auto priming level time
0 - 60 s
This is the time necessary to fill up the
venous drip chamber to a correct level.
10
Auto priming flush time 1
0 - 300 s
During this time, the remaining air in
the dialyzer and blood lines will be expelled.
11
Auto priming flush time 2
0 - 600 s
If a second flush is requested, select this time.
12
Auto priming venous line time
0 - 120 s
The time when the venous clamp is open.
In order to expell any air bubbles in the
venous line.
13
Auto priming FM active
Avail / Not Avail
Summary of Contents for AK 95
Page 1: ...AK 95 AK 95 S Service Manual A better way to better care ...
Page 5: ...This page is intentionally left blank ...
Page 6: ...Installation Guide AK 95 AK 95 S January 2004 ...
Page 7: ......
Page 20: ......
Page 102: ...Maintenance Manual AK 95 AK 95 S October 2006 GAMBRO ...
Page 103: ......
Page 125: ...5 22 MaintenanceManual AK95 AK95SHCEN12189Rev 10 2006 This page is intentionally left blank ...
Page 126: ......
Page 152: ...Spare Parts List AK 95 AK 95 S October 2005 ...
Page 153: ......
Page 159: ...HCEN9094Rev 10 2005 7 3 Operator s panel 9 1 3 4 5 6 5 7 5 2 8 6 6 8 ...
Page 161: ...HCEN9094Rev 10 2005 7 4 Blood pump 10 2 8 3 5 9 4 7 1 6 11 12 ...
Page 163: ...HCEN9094Rev 10 2005 7 5 Blood pump Motor unit 8 7 6 9 2 10 3 4 5 1 11 ...
Page 165: ...HCEN9094Rev 10 2005 7 6 Heparin pump 1 2 3 4 5 6 8 7 ...
Page 169: ...HCEN9094Rev 10 2005 7 8 Magnetic Clamp unit 1 2 3 7 8 12 16 4 5 6 9 10 11 17 18 14 13 19 15 ...
Page 181: ...HCEN9094Rev 10 2005 7 13 Heater Flow guard 3 9 1 2 10 4 8 7 11 12 13 5 6 3 ...
Page 189: ...HCEN9094Rev 10 2005 Protective Protective 7 17 Boards 7 1 2 9 6 5 4 3 8 ...
Page 191: ...HCEN9094Rev 10 2005 1 7 18 Rear box 6 3 7 5 4 2 ...
Page 195: ...HCEN9094Rev 10 2005 T12AH 250AC BACH BACO HALT 7 20 AC DC 2 4 5 1 6 7 8 9 3 ...
Page 205: ...HCEN9094Rev 10 2005 7 25 MM I O board 3 2 9 4 6 7 8 5 1 10 ...
Page 215: ...HCEN9094Rev 10 2005 7 30 UFD Option 4 5 7 17 12 9 6 18 1 6 11 16 8 10 6 13 14 3 2 6 19 15 ...
Page 219: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Page 221: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Page 224: ......
Page 225: ...9 1 HCEN9160 Revision10 2005 Service Manual Symbols Chapter9 SymbolDescription ...
Page 228: ...9 4 HCEN9160Revision10 2005 Service Manual Symbols Thispageisleftintentionallyblank ...
Page 234: ...Replacements 10 6 AK 95 AK95SHCEN12078Rev 10 2005 This page is intentionally left blank ...
Page 247: ...AK 95 AK 95 S Service Manual ...