![background image](http://html.mh-extra.com/html/fujitsu/primergy-bx924-s3/primergy-bx924-s3_upgrade-and-maintenance-manual_121030065.webp)
BX924 S3
Upgrade and Maintenance Manual
65
Basic hardware procedures
4.9
Switching on the server blade
V
CAUTION!
●
Before switching on the server blade, make sure the cover is closed.
In order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
PRIMERGY BX924 S3 server blade must not run while the cover is
removed.
●
Follow the safety instructions in chapter
"Important information" on
page 31
.
Figure 13: Power button on the front panel
Ê
Press the On / Off button (1) to start up the server blade.
Ê
Ensure that the power-on indicator (2) in the On / Off button is lit green.
I
For more information, refer to section
"Front panel indicators" on
page 288
.
Summary of Contents for PRIMERGY BX924 S3
Page 6: ...Upgrade and Maintenance Manual BX924 S3 ...
Page 16: ...16 Upgrade and Maintenance Manual BX924 S3 ...
Page 20: ...20 Upgrade and Maintenance Manual BX924 S3 Introduction ...
Page 42: ...42 Upgrade and Maintenance Manual BX924 S3 Important information ...
Page 68: ...68 Upgrade and Maintenance Manual BX924 S3 Basic hardware procedures ...
Page 104: ...104 Upgrade and Maintenance Manual BX924 S3 Basic software procedures ...
Page 180: ...180 Upgrade and Maintenance Manual BX924 S3 Main memory ...
Page 232: ...232 Upgrade and Maintenance Manual BX924 S3 Processors ...
Page 278: ...278 Upgrade and Maintenance Manual BX924 S3 System board components ...