![background image](http://html.mh-extra.com/html/fujitsu/primergy-bx924-s3/primergy-bx924-s3_upgrade-and-maintenance-manual_121030218.webp)
218
Upgrade and Maintenance Manual
BX924
S3
Processors
9.5
Handling processor heat sinks
9.5.1
Required tools
●
Preliminary and concluding steps: tool-less
●
Installing or removing the processor heat sink:
– Phillips PH2 / (+) No. 2 screw driver
9.5.2
Preliminary steps
Before installing, removing or replacing the processor heat sink, perform the
following steps:
Ê
Shut down the server blade as described in section
"Shutting down the
server blade" on page 54
.
Ê
Remove the server blade from the system unit as described in section
"Removing the server blade from the system unit" on page 59
.
Ê
Open the server blade as described in section
"Opening the server blade"
on page 60
.
Ê
If necessary, remove the memory as described in section
"Removing a
memory module" on page 173
.
Field Replaceable Units (FRU)
Average task duration: 15 minutes
Summary of Contents for PRIMERGY BX924 S3
Page 6: ...Upgrade and Maintenance Manual BX924 S3 ...
Page 16: ...16 Upgrade and Maintenance Manual BX924 S3 ...
Page 20: ...20 Upgrade and Maintenance Manual BX924 S3 Introduction ...
Page 42: ...42 Upgrade and Maintenance Manual BX924 S3 Important information ...
Page 68: ...68 Upgrade and Maintenance Manual BX924 S3 Basic hardware procedures ...
Page 104: ...104 Upgrade and Maintenance Manual BX924 S3 Basic software procedures ...
Page 180: ...180 Upgrade and Maintenance Manual BX924 S3 Main memory ...
Page 232: ...232 Upgrade and Maintenance Manual BX924 S3 Processors ...
Page 278: ...278 Upgrade and Maintenance Manual BX924 S3 System board components ...