![background image](http://html.mh-extra.com/html/fujitsu/primergy-bx924-s3/primergy-bx924-s3_upgrade-and-maintenance-manual_121030115.webp)
BX924 S3
Upgrade and Maintenance Manual
115
Solid state drives
Ê
Secure the mounting kit with the knurled screw (3). Torque: 0.2 Nm (not
applicable for the Japanese market)
6.3.6
Concluding steps
Perform the following procedures to complete the task:
Ê
Close the server blade as described in section
"Closing the server blade" on
page 61
.
Ê
Reinstall and secure the server blade in the system unit as described in
section
"Installing the server blade in the system unit" on page 62
.
Ê
If applicable, close the rack door as described in section
"Closing the rack
door" on page 67
.
Ê
Please observe the notes on RAID rebuild in section
"Performing a RAID
array rebuild" on page 100
.
Summary of Contents for PRIMERGY BX924 S3
Page 6: ...Upgrade and Maintenance Manual BX924 S3 ...
Page 16: ...16 Upgrade and Maintenance Manual BX924 S3 ...
Page 20: ...20 Upgrade and Maintenance Manual BX924 S3 Introduction ...
Page 42: ...42 Upgrade and Maintenance Manual BX924 S3 Important information ...
Page 68: ...68 Upgrade and Maintenance Manual BX924 S3 Basic hardware procedures ...
Page 104: ...104 Upgrade and Maintenance Manual BX924 S3 Basic software procedures ...
Page 180: ...180 Upgrade and Maintenance Manual BX924 S3 Main memory ...
Page 232: ...232 Upgrade and Maintenance Manual BX924 S3 Processors ...
Page 278: ...278 Upgrade and Maintenance Manual BX924 S3 System board components ...