![background image](http://html.mh-extra.com/html/fujitsu/primergy-bx924-s3/primergy-bx924-s3_upgrade-and-maintenance-manual_121030251.webp)
BX924 S3
Upgrade and Maintenance Manual
251
System board components
10.3 Trusted Platform Module (TPM)
This section provides information on how to install, remove or replace the
Trusted Platform Module (TPM).
10.3.1 Installing the TPM
10.3.1.1 Required tools
●
Preliminary and concluding steps:
– Phillips PH2 / (+) No. 2 screw driver
●
Installing the TPM:
– Bit screw driver
– TPM bit insert
(
*
)
(
*
)
For the Japanese market:
– TPM module fixing tool (S26361-F3552-L909)
10.3.1.2 Preliminary steps
Before installing the TPM, perform the following steps:
Ê
Disable BitLocker functionality as described in section
"Disabling BitLocker
functionality" on page 73
.
Ê
If applicable, open the rack door as described in section
"Opening the rack
door" on page 53
.
Ê
Locate the desired server blade as described in section
"Locating the
defective server blade" on page 45
.
Field Replaceable Units (FRU)
Average hardware task duration: 5 minutes
Average software task duration: 5 minutes
Summary of Contents for PRIMERGY BX924 S3
Page 6: ...Upgrade and Maintenance Manual BX924 S3 ...
Page 16: ...16 Upgrade and Maintenance Manual BX924 S3 ...
Page 20: ...20 Upgrade and Maintenance Manual BX924 S3 Introduction ...
Page 42: ...42 Upgrade and Maintenance Manual BX924 S3 Important information ...
Page 68: ...68 Upgrade and Maintenance Manual BX924 S3 Basic hardware procedures ...
Page 104: ...104 Upgrade and Maintenance Manual BX924 S3 Basic software procedures ...
Page 180: ...180 Upgrade and Maintenance Manual BX924 S3 Main memory ...
Page 232: ...232 Upgrade and Maintenance Manual BX924 S3 Processors ...
Page 278: ...278 Upgrade and Maintenance Manual BX924 S3 System board components ...