![background image](http://html.mh-extra.com/html/fujitsu/primergy-bx924-s3/primergy-bx924-s3_upgrade-and-maintenance-manual_121030238.webp)
238
Upgrade and Maintenance Manual
BX924
S3
System board components
10.1.5 Concluding steps
Perform the following procedures to complete the task:
Ê
Dispose of the CMOS battery in accordance with local regulations
concerning special waste.
Ê
Close the server blade as described in section
"Closing the server blade" on
page 61
.
Ê
Reinstall and secure the server blade in the system unit as described in
section
"Installing the server blade in the system unit" on page 62
.
Ê
Verify and update time settings as described in section
"Verifying the system
time settings" on page 94
.
Ê
If applicable, close the rack door as described in section
"Closing the rack
door" on page 67
.
Summary of Contents for PRIMERGY BX924 S3
Page 6: ...Upgrade and Maintenance Manual BX924 S3 ...
Page 16: ...16 Upgrade and Maintenance Manual BX924 S3 ...
Page 20: ...20 Upgrade and Maintenance Manual BX924 S3 Introduction ...
Page 42: ...42 Upgrade and Maintenance Manual BX924 S3 Important information ...
Page 68: ...68 Upgrade and Maintenance Manual BX924 S3 Basic hardware procedures ...
Page 104: ...104 Upgrade and Maintenance Manual BX924 S3 Basic software procedures ...
Page 180: ...180 Upgrade and Maintenance Manual BX924 S3 Main memory ...
Page 232: ...232 Upgrade and Maintenance Manual BX924 S3 Processors ...
Page 278: ...278 Upgrade and Maintenance Manual BX924 S3 System board components ...