
184
Upgrade and Maintenance Manual
BX924
S3
Processors
9.2.3
Installing a processor
I
This description applies to the following procedures:
– Installing the second CPU in a single-processor configuration
– Transfering a CPU after replacing the system board (see section
"Removing processors" on page 194
and
"Installing processors" on
page 182
).
Figure 59: Opening socket release lever 1
Ê
Unlatch the socket release lever marked
Open 1st
by pushing it down and
away from the socket (1).
Ê
The socket release lever will slightly lift up (2).
Summary of Contents for PRIMERGY BX924 S3
Page 6: ...Upgrade and Maintenance Manual BX924 S3 ...
Page 16: ...16 Upgrade and Maintenance Manual BX924 S3 ...
Page 20: ...20 Upgrade and Maintenance Manual BX924 S3 Introduction ...
Page 42: ...42 Upgrade and Maintenance Manual BX924 S3 Important information ...
Page 68: ...68 Upgrade and Maintenance Manual BX924 S3 Basic hardware procedures ...
Page 104: ...104 Upgrade and Maintenance Manual BX924 S3 Basic software procedures ...
Page 180: ...180 Upgrade and Maintenance Manual BX924 S3 Main memory ...
Page 232: ...232 Upgrade and Maintenance Manual BX924 S3 Processors ...
Page 278: ...278 Upgrade and Maintenance Manual BX924 S3 System board components ...