![background image](http://html.mh-extra.com/html/fujitsu/primergy-bx924-s3/primergy-bx924-s3_upgrade-and-maintenance-manual_121030270.webp)
270
Upgrade and Maintenance Manual
BX924
S3
System board components
10.5 Replacing the system board
10.5.1 Required tools
●
Preliminary and concluding steps: tool-less
●
Replacing the system board:
– Phillips PH2 / (+) No. 2 screw driver
●
Replacing the system board:
– Magnifying glass for inspecting CPU socket springs (recommended)
If a TPM module is installed:
– Bit screw driver
– TPM bit insert
(
*
)
– thin slotted screw driver (
2 x 0.4 mm)
(
*
)
(
*
)
For the Japanese market:
– Dedicated TPM screw driver (CWZ8291A)
– TPM module fixing tool (S26361-F3552-L909)
Field Replaceable Units (FRU)
Average hardware task duration: 50 minutes
Average software task duration: 10 minutes
Summary of Contents for PRIMERGY BX924 S3
Page 6: ...Upgrade and Maintenance Manual BX924 S3 ...
Page 16: ...16 Upgrade and Maintenance Manual BX924 S3 ...
Page 20: ...20 Upgrade and Maintenance Manual BX924 S3 Introduction ...
Page 42: ...42 Upgrade and Maintenance Manual BX924 S3 Important information ...
Page 68: ...68 Upgrade and Maintenance Manual BX924 S3 Basic hardware procedures ...
Page 104: ...104 Upgrade and Maintenance Manual BX924 S3 Basic software procedures ...
Page 180: ...180 Upgrade and Maintenance Manual BX924 S3 Main memory ...
Page 232: ...232 Upgrade and Maintenance Manual BX924 S3 Processors ...
Page 278: ...278 Upgrade and Maintenance Manual BX924 S3 System board components ...