![background image](http://html.mh-extra.com/html/fujitsu/primergy-bx924-s3/primergy-bx924-s3_upgrade-and-maintenance-manual_121030243.webp)
BX924 S3
Upgrade and Maintenance Manual
243
System board components
Ê
If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
"Enabling
BitLocker functionality" on page 99
.
10.2.1.5 Software configuration
The UFM delivery set includes the "Recovery Tool CD" to setup the ESXi
configuration. Proceed as follows:
Ê
Switch on the server blade.
Ê
Right after switching on the server, insert the "Recovery Tool CD" into the
DVD drive and close the drive tray.
Ê
The server should now boot from the "Recovery Tool CD".
Ê
Follow the on-screen instructions.
10.2.2 Removing the UFM
10.2.2.1 Required tools
●
Preliminary and concluding steps: tool-less
●
Removing the UFM:
– Phillips PH0 / (+) No. 0 screw driver
Field Replaceable Units (FRU)
Average hardware task duration: 5 minutes
Average software task duration: 5 minutes
Summary of Contents for PRIMERGY BX924 S3
Page 6: ...Upgrade and Maintenance Manual BX924 S3 ...
Page 16: ...16 Upgrade and Maintenance Manual BX924 S3 ...
Page 20: ...20 Upgrade and Maintenance Manual BX924 S3 Introduction ...
Page 42: ...42 Upgrade and Maintenance Manual BX924 S3 Important information ...
Page 68: ...68 Upgrade and Maintenance Manual BX924 S3 Basic hardware procedures ...
Page 104: ...104 Upgrade and Maintenance Manual BX924 S3 Basic software procedures ...
Page 180: ...180 Upgrade and Maintenance Manual BX924 S3 Main memory ...
Page 232: ...232 Upgrade and Maintenance Manual BX924 S3 Processors ...
Page 278: ...278 Upgrade and Maintenance Manual BX924 S3 System board components ...