![Fuji Electric FRENIC-MEGA Instruction Manual Download Page 95](http://html1.mh-extra.com/html/fuji-electric/frenic-mega/frenic-mega_instruction-manual_2341853095.webp)
3-38
Ch
ap
. 3
O
PERA
T
IO
N USING
TH
E KEY
P
A
D
Confirmation screen
This screen is to confirm whether to start measurement.
Waiting for run command (On standby for measurement)
(7) Wait for a run command to enter.
Upon reception of a run command, the measurement starts.
If a run command has already been received, this screen will be skipped.
Measurement in progress
Measurement continues until the stop of the inverter.
Measurement completed
Maximum output current
Average output current
Average braking power
(When measurement completes, the results appear.)
Figure 3.31 Screen Transition for "Load Factor Measurement" (Start-to-stop measurement mode)
Going back to Running mode
When measurement of the load factor is in progress, pressing the
key switches the inverter to Running mode, and
pressing. the
key, to the mode selection screen. This switching does not interrupt measurement.
Selecting the "9: LOAD FCTR" menu on the menu screen again allows you to confirm whether or not measurement is in
progress.
After measurement has completed, pressing the
key on the mode selection screen displays the measurement results.
Screen when measurement is in progress
Turning the inverter OFF clears the measurement result.
(6) If OK, press key to switch to standby for measurement.
Run command
ON
Measurement starts upon reception of a run command.
Pressing
/
key terminates the measurement.
To go back to Mode selection, press
key.
/
Summary of Contents for FRENIC-MEGA
Page 36: ...2 6 Unit inch mm Refer to Section 2 3 3 9...
Page 356: ...MEMO...