
Chapter 7 Customer Replaceable Units (CRUs)
Installing and Removing the Optional V-Rail Kit
SuperLoader 3 Autoloader User’s Guide
99
Figure 23 .375
Square Hole Rack
Installation
2
Mount the front cover plate to the vertical rail in the identified holes
by using 10-32 x .625 bolts in the center two holes of the plate.
3
Mount the tab of the autoloader to the upper and lower holes in the
front cover plate using 10-32 x .625 bolts.
Installation in a
.280 Diameter Thru
Hole Rack
7
To install the rail in a .280 diameter thru hole rack:
1
Identify the correct mounting holes on the vertical rail, making sure
that the selected holes are on the same level.
Summary of Contents for Quantum SuperLoader 3
Page 9: ...Contents SuperLoader 3 Autoloader User s Guide ix Index 205...
Page 10: ...Contents x SuperLoader 3 Autoloader User s Guide...
Page 22: ...Chapter 1 Introduction Overview 4 SuperLoader 3 Autoloader User s Guide...
Page 58: ...Chapter 3 Operating the Autoloader Data Compression 40 SuperLoader 3 Autoloader User s Guide...
Page 76: ...Chapter 4 On board Remote Management Commands Page 58 SuperLoader 3 Autoloader User s Guide...
Page 178: ...Appendix A Specifications Tape Drive Specifications 160 SuperLoader 3 Autoloader User s Guide...
Page 204: ...Event Error Logs SDLT600 only 186 SuperLoader 3 Autoloader User s Guide...
Page 230: ...Index 212 SuperLoader 3 Autoloader User s Guide...