Preventative maintenance schedule for DCF
What do I do?
When do I do it?
When should I replace it?
Inspect the blast disk.
Daily
Replace if there is excessive wear on the disk or
if you see splashback between the blast disk
and carbide plate.
Rinse off the blast ring
with water, and then
inspect the inside of it.
Daily or every 200
pierces, depending
on material thickness
Replace at the first sign of wear. However, if you
see spray come through the blast ring during
operation, replace it immediately.
Inspect the brush foot
and measure the length
of the bristles.
Weekly
Replace when approximately one-third of the
bristles are gone or if the length of the bristles
have been reduced by 1 mm.
Inspect the foot
assembly and bellows.
Weekly
Replace any foot assembly that shows
damage, including pinholes or cracks in the
bellows.
Rotate the carbide plate
about 5° to distribute
wear evenly.
Weekly
—
Inspect the carbide
insert.
Often
Replace at the first sign of wear.
© 2021 Flow International Corp.
Retrieved from Flow KB on April 14, 2021 PST
Ancillary option: Dynamic Contour Follower
Summary of Contents for MACH 300
Page 1: ...MACH 300 SYSTEM MANUAL Includes Ancillary Options M 810 REV C en APRIL 2021...
Page 28: ...View 2 2021 Flow International Corp Retrieved from Flow KB on April 12 2021 PST Safety...
Page 29: ...View 3 2021 Flow International Corp Retrieved from Flow KB on April 12 2021 PST Safety...
Page 107: ...ANCILLARY OPTIONS For Mach 300...