Lubricate the bearings and linear rails · (A)
Where used
Mach 500 · Mach 300
Recommended maintenance interval
Every 120 hours of operation
Good to know!
Z-axis rails do not require lubrication.
Tools
• Hex key
• MG70 grease gun
(supplied with machine)
• Phillips screwdriver
Supplies
• AFF Grease cartridge · A-31748-1
• Clean, lint-free cloth
• Sheet of plywood
Grease points
View: User faces the front of the machine.
X-axis bearings ……………… Bridge, rear side, center
X-axis ball nut ……………… Motor drives enclosure, rear side
V-axis bearings ……………… Left riser, rear side
V-axis ball nut ……………… Left base rail
Y-axis bearings ……………… Right riser, rear side
Y-axis ball nut ……………… Right base rail
Z-axis ball nut ……………… Z-axis enclosure
© 2021 Flow International Corp.
Retrieved from Flow KB on April 15, 2021 PST
Bellows, bearings, and linear rails maintenance
Summary of Contents for MACH 300
Page 1: ...MACH 300 SYSTEM MANUAL Includes Ancillary Options M 810 REV C en APRIL 2021...
Page 28: ...View 2 2021 Flow International Corp Retrieved from Flow KB on April 12 2021 PST Safety...
Page 29: ...View 3 2021 Flow International Corp Retrieved from Flow KB on April 12 2021 PST Safety...
Page 107: ...ANCILLARY OPTIONS For Mach 300...