![background image](http://html1.mh-extra.com/html/flow/mach-300/mach-300_manual_2307753144.webp)
2. Insert the bulk bag into the bag frame:
a. Offset the corners of the bag from the corners of the bag frame so that the lifting straps
do not line up directly on the corners.
b. Push down the lifting straps into the channel between the bag cage and the outer wall of
the VacBOX, making sure they do not come into direct contact with the rubber seal on
the lid. If the lifting straps are trapped between the top of the bag cage and the rubber lid
seal, loss of vacuum will occur and machine performance will decrease.
c. Spread the bag evenly across the top of the bag support frame to ensure a good seal
when the door is closed.
3. Close the VacBOX lid:
a. Turn the directional control valve counterclockwise, and then use the hand pump to
secure the door.
b. Secure the two door lock pivot bolts.
NOTICE!
Do not overtighten the door lock bolts as damage to the door tabs may result.
© 2021 Flow International Corp.
Retrieved from Flow KB on April 14, 2021 PST
Ancillary option: Abrasive Transfer System (ATS)
Summary of Contents for MACH 300
Page 1: ...MACH 300 SYSTEM MANUAL Includes Ancillary Options M 810 REV C en APRIL 2021...
Page 28: ...View 2 2021 Flow International Corp Retrieved from Flow KB on April 12 2021 PST Safety...
Page 29: ...View 3 2021 Flow International Corp Retrieved from Flow KB on April 12 2021 PST Safety...
Page 107: ...ANCILLARY OPTIONS For Mach 300...