![background image](http://html1.mh-extra.com/html/flow/mach-300/mach-300_manual_2307753086.webp)
To lubricate the bearings and linear rails, do the following:
1. Put a sheet of plywood on the catcher tank so that objects do not fall into the tank while you
lubricate the bearings and linear rails.
2. Remove the X, Y, and V axes access panels with a Phillips screwdriver.
3. Remove the Z-axis cover, and then remove the access panel with a hex key.
4. Locate the Zerk fitting for each ball nut. If necessary, jog the machine until the Zerk fittings are
accessible.
5. Do a Lockout/Tagout (LOTO) for the machine.
6. Lubricate each ball nut with three pumps of grease from the grease gun.
7. Lubricate the bearings with three pumps of grease from the grease gun.
8. Install the X, Y, and V axes access panels with a Phillips screwdriver.
9. Install the Z-axis access panel with a hex key, and then install the Z-axis cover.
© 2021 Flow International Corp.
Retrieved from Flow KB on April 15, 2021 PST
Bellows, bearings, and linear rails maintenance
Summary of Contents for MACH 300
Page 1: ...MACH 300 SYSTEM MANUAL Includes Ancillary Options M 810 REV C en APRIL 2021...
Page 28: ...View 2 2021 Flow International Corp Retrieved from Flow KB on April 12 2021 PST Safety...
Page 29: ...View 3 2021 Flow International Corp Retrieved from Flow KB on April 12 2021 PST Safety...
Page 107: ...ANCILLARY OPTIONS For Mach 300...