Recommended maintenance schedule
Where used
Mach 500 · Mach 300 · Mach 200 · Mach 100
We recommend that you keep a log of all maintenance work that is done on your machine.
What do I do?
When do I do it?
Start-up inspection
Daily
Inspect the mixing tube.
Daily
Spray the mixing chamber vent with clean water.
Every four hours of operation
Clean the cutting head with air.
Weekly
Dynamic Waterjet height sensor calibration
Weekly
Dynamic Waterjet straightness adjustment
Weekly
Clean and inspect the bellows for rips.
Monthly
Lubricate the bearings and linear rails.
Every 120 hours of operation
Clean the linear rails.
Every 120 hours of operation
Clean the diamond orifice and nozzle nut.
Every 250 hours of operation
Replace the diamond orifice.
As required
Call Flow to schedule a ballbar test.
Every six months
© 2021 Flow International Corp.
Retrieved from Flow KB on April 15, 2021 PST
Get started: Upkeep Fundamentals
Summary of Contents for MACH 300
Page 1: ...MACH 300 SYSTEM MANUAL Includes Ancillary Options M 810 REV C en APRIL 2021...
Page 28: ...View 2 2021 Flow International Corp Retrieved from Flow KB on April 12 2021 PST Safety...
Page 29: ...View 3 2021 Flow International Corp Retrieved from Flow KB on April 12 2021 PST Safety...
Page 107: ...ANCILLARY OPTIONS For Mach 300...