Installation Instructions
Page 60 Panda_AGT-DC_5000_12V_s01285_Operation manual.R03 - Chapter 5: Installation Instructions
22.3.11
5.2
Generator Connections - Scheme
The generator comes supplied with all supply lines (i.e. electric cables, fuel lines etc.) already
connected to the motor and generator. The supply lines are fed through the capsule's front base
panel and are shielded at the capsule inlets with water-proof grommets.
All electrical connections, cable types and sizes must comply to the appropriate regulati-
ons. The supplied cables are rated for ambient temperatures up to 70°C (160°F). If the
cables are required to meet higher temperature requirements, they must be run through
conduits.
ATTENTION! Before working (installation) on the System read the section see “General
safety references concerning operation of an AGT generator.” on page 25 in this Manual.
Fig. 5.2-1: Connections
Fig. 5.2-2: Connections
2
3
5
6
7
8
9
10
11
1
4
12
13
1.
Raw water intake
2.
Connection fuel IN
3.
Connection fuel OUT
4.
Cable for fuel pump
5.
Oil drain hose
6.
Cable for remote control panel
7.
Cable for VCS
8.
Cable for voltage sense (clamp 7+8)
9.
Cable for measuring shunt (clamp 9+10)
10. Cable for starter battery minus (-)
11. Cable for starter battery plus (+)
12. Passage for service batterie cable
13. Passage for service batterie cable
2
3
4
1
1.
Exhaust output
2.
In-flow from external cooling water expansion tank
3.
Return to external cooling water expansion tank
4.
Connection external ventilation valve