Installation Instructions
22.3.11
Panda_AGT-DC_5000_12V_s01285_Operation manual.R03 - Chapter 5: Installation Instructions Page 79
5.8
Voltage Control System
It is of upmost importance to check the correct functioning of the voltage control system (VCS)
during installation or maintenance.
Fig. 5.8-1: VCS
S1 : CAUTION:
The VCS is preset according to the output voltage of the generator. The nominal voltage
level of the VCS is imprinted on the top side (S1). Examine whether this voltage agree with
the nominal output voltage.
Instructions:
At the installation and at the service it is absolutely necessary that the function of the
voltage regulation system is examined correctly.
Connector 1
T1
Terminal 1
+ Actuator
Ac
T2
Terminal 2
- Actuator
Actuator–
T3
Terminal 3
+ Battery
B 12V
T4
Terminal 4
- Battery
Battery 0V
T5
Terminal 5
L-Con
Charge control
T6
Terminal 6
VCS-ON
DP+ fuel pump
T4
T1
T2
T7
T3
T6
T9
T8
T10
T5
S1