The Panda Generator
Page 48 Panda_AGT-DC_5000_12V_s01285_Operation manual.R03 - Chapter 4: The Panda Generator
22.3.11
Electrical connections for control
At the front of the generator also all remai-
ning cables for the electrical connections
are depending upon type. The allocation
of the connections result from the plan for
the AC-Control box. See here:
1. Fuel pump
2. Remote control panel
3. VCS
4. Voltage sense 24V
5. Shunt measurement
Fig. 4.3.5-3: Electrical connections
Starter motor
1. Starter motor and
2. Solenoid switch
The Diesel engine is electrically started.
On the back of the engine is accordingly
the electrical starter with the solenoid
switch.
Fig. 4.3.5-4: Starter motor
Actuator for speed regulation
The generator voltage is determined by
progressive speed control through "VCS"
in conjunction with the speed actuator.
Speed increases with increasing load.
Fig. 4.3.5-5: Actuator
4
3
1
2
5
1
2