EPSON EPL-N3000/AcuLaser M4000N
Revision C
Disassembly and Assembly
500 Paper Exit
264
Confidential
Installation
1.
Remove the LINK GATE OCT that is assembled to the removed CHUTE UP
EXIT.
2.
Secure the CHUTE UP EXIT to the CHUTE LOW EXIT with the two screws
(gold, tapping, 8mm).
3.
Put the LINK GATE OCT in the place shown in Figure 1 in the two arm sections
of the CHUTE LOW EXIT, and turn it in the direction of the arrow.
4.
Push the LINK GATE OCT in the direction of the arrow shown in Figure 2 as far
as it will go to have it locked by the CHUTE LOW EXIT.
5.
Install the 500 EXIT ASSY. (p.262)
6.
Install the COVER EXIT 500. (p.261)
7.
Install the COVER RIGHT. (p.168)
8.
Install the COVER LEFT. (p.169)
9.
Install the COVER REAR. (p.167)
10.
Install the COVER REAR 500. (p.270)
Figure 4- 75. CHUTE UP EXIT, CHUTE LOW EXIT Installation
C H E C K
P O I N T
After installation, make sure that the LINK GATE OCT is
located in the far side of the GATE. (Note 1)
After installation, make sure that the front end of the LINK
GATE OCT is located under the hook of the CHUTE LOW
EXIT. (Note 2)
After installation, make sure that the GATE moves when the
LINK GATE OCT is pushed in the direction of the arrow.
(Note 2)
C A U T I O N
Pay attention to the difference between the two types of screws and
use them at their correct positions respectively.
JG3079AA
Note1)
Note2)
GATE
HOOK
LINK
GATE OCT
Summary of Contents for AcuLaser M4000N
Page 19: ...Confidential C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 33: ...Confidential C H A P T E R 2 OPERATINGPRINCIPLES ...
Page 63: ...Confidential C H A P T E R 3 TROUBLESHOOTING ...
Page 160: ...Confidential C H A P T E R 4 DISASSEMBLYANDASSEMBLY ...
Page 396: ...Confidential C H A P T E R 5 ADJUSTMENT ...
Page 404: ...Confidential C H A P T E R 6 MAINTENANCE ...