EPSON EPL-N3000/AcuLaser M4000N
Revision C
Disassembly and Assembly
Option Duplex
352
Confidential
Installation
1.
Move the three ROLLs DUP in the direction opposite to the arrow, and install
them to the three BEARINGs DUP on the GEAR ROLL side.
2.
After fitting the BEARING DUP to the ROLL DUP on the side opposite to the
GEAR ROLL, secure it to the mounting hole of the COVER HSG DUP with the
hook.
3.
Secure the three GEARs ROLL to the ROLLs DUP with the hooks.
4.
Install the COVER DAMPER and SPRING DAMPER to the COVER HSG DUP
with the two screws (gold, tapping, 8mm) and ONE SCREW TAPPING.
5.
Install the HSG LOWER DUP. (p.344)
6.
Install the HSG UPPER ASSY. (p.343)
7.
Install the COVER RIGHT. (p.354)
8.
Install the COVER LEFT. (p.353)
C H E C K
P O I N T
When installing the ROLLs DUP, take care not to hold any rubber
portion.
C H E C K
P O I N T
Tighten the SCREW TAPPING, which secures the COVER
DAMPER, together with the SPRING DAMPER.
C H E C K
P O I N T
When installing the COVER RIGHT, match its positioning holes
with the bosses of the COVER HSG DUP.
C H E C K
P O I N T
When installing the COVER LEFT, match its positioning holes
with the bosses of the COVER HSG DUP.
Summary of Contents for AcuLaser M4000N
Page 19: ...Confidential C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 33: ...Confidential C H A P T E R 2 OPERATINGPRINCIPLES ...
Page 63: ...Confidential C H A P T E R 3 TROUBLESHOOTING ...
Page 160: ...Confidential C H A P T E R 4 DISASSEMBLYANDASSEMBLY ...
Page 396: ...Confidential C H A P T E R 5 ADJUSTMENT ...
Page 404: ...Confidential C H A P T E R 6 MAINTENANCE ...