EPSON EPL-N3000/AcuLaser M4000N
Revision C
Disassembly and Assembly
550 Paper Feeder
225
Confidential
Installation
1.
Install the 550 FEEDER ASSY to the frame.
2.
Secure the CHUTE OUT to the frame with the two screws (silver, with collars,
with spring washers, 8mm).
3.
Secure the PLATE TIE to the frame with the four screws (silver, with collars, with
spring washers, 8mm).
4.
Clamp the harness with the two clamps of the PLATE TIE. (See the figure)
5.
Connect the connector (P/J248) of the HARNESS ASSY TRAY 2 to the
HARNESS ASSY CHUTE.
6.
Install the 150 FEEDER ASSY. (p.211)
7.
Install the CHUTE TRANSFR. (p.255)
8.
Install the FAN MAIN. (p.293)
9.
Install the COVER REAR. (p.167)
10.
Install the FUSER ASSY. (p.253)
11.
Install the COVER REAR 500. (p.270)
Figure 4- 49. 550 FEEDER ASSY Installation
C A U T I O N
One of the screws securing the CHUTE OUT to the frame should
also tighten the SPRING EARTH.
C A U T I O N
When installing, pass the harness through the notch of the PLATE
TIE and route it as indicated by the arrow.
C A U T I O N
In the hole on the left side of the CHUTE TRANSFER, a screw need
not be tightened.
C A U T I O N
Pay attention to the difference between the two types of screws and
use them at their correct positions respectively.
JG3114AA
CLAMP
CLAMP
NOTCH
HARNESS ASSY TRAY2
HARNESS ASSY CHUTE
HARNESS ASSY TRA
HARNESS ASSY
7)
8)
8)
Summary of Contents for AcuLaser M4000N
Page 19: ...Confidential C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 33: ...Confidential C H A P T E R 2 OPERATINGPRINCIPLES ...
Page 63: ...Confidential C H A P T E R 3 TROUBLESHOOTING ...
Page 160: ...Confidential C H A P T E R 4 DISASSEMBLYANDASSEMBLY ...
Page 396: ...Confidential C H A P T E R 5 ADJUSTMENT ...
Page 404: ...Confidential C H A P T E R 6 MAINTENANCE ...