EPSON EPL-N3000/AcuLaser M4000N
Revision C
Disassembly and Assembly
Option OCT
372
Confidential
4.13.10 SENSOR OCT
Removal
1.
Remove the COVER REAR. (p.362)
2.
Remove the COVER OCT. (p.364)
3.
Remove the COVER FRONT. (p.366)
4.
Release the HARNESS ASSY OCT SNR from the hook.
5.
Disconnect the HARNESS ASSY OCT SNR from the connector (P/J730) of the
SENSOR OCT.
6.
Remove the SPRING ACTUATOR.
7.
Move the ACTUATOR OCT in the direction of the arrow to remove it from the
left and right hooks.
8.
Release the hooks of the SENSOR OCT, and remove the SENSOR OCT from the
HOUSING OCT.
Figure 4- 167. SENSOR OCT Removal
Figure 4- 168. SENSOR OCT Removal
JG3812AA
SENSOR OCT
HOUSING OCT
8-1)
8-2)
8-1)
6)
4)
7)
5)
HOOK
HOOKS
ACTUATOR OCT
HOUSING OCT
HARNESS ASSY OCT SNR
SPRING ACTUATOR
JG3811AA
Summary of Contents for AcuLaser M4000N
Page 19: ...Confidential C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 33: ...Confidential C H A P T E R 2 OPERATINGPRINCIPLES ...
Page 63: ...Confidential C H A P T E R 3 TROUBLESHOOTING ...
Page 160: ...Confidential C H A P T E R 4 DISASSEMBLYANDASSEMBLY ...
Page 396: ...Confidential C H A P T E R 5 ADJUSTMENT ...
Page 404: ...Confidential C H A P T E R 6 MAINTENANCE ...