Air Purge Mounting
Figure 2-3:
A.
Site mounting flange or isolating valve flange
B.
Adusting nuts
C.
Locking nuts
D.
Air purge
E.
Rear flange
F.
Front flange
2.5.4
Air purge units
Use the general procedure that follows to install the air purge units on the site mounting
flanges or on the exposed flanges of the customer supplied isolating valves, if used.
CAUTION!
CONTAMINATION
Always connect and turn on the purge air supply to both air purge units before mounting the
air purge units. Failure to flow purge air may allow the optical surfaces of the source and
receiver units to become severely contaminated.
Procedure
1.
Remove the four locking nuts holding the front flange to the rear flange (
2.
Carefully work and pull the front flange from the air purge unit.
3.
Align the four holes on the front flange with the four holes on the site mounting
flange.
4.
Fasten the front flange to the site mounting flange with the four countersunk screws
and gaskets provided.
5.
Connect and turn on a compressed air or blower air supply to the purge unit. Always
flow purge air before installing an air purge unit on the duct.
Install
Reference Manual
13
Summary of Contents for Rosemount CCO 5500
Page 4: ......
Page 8: ...Contents iv Rosemount CCO 5500 ...
Page 28: ...System Wiring Diagram Figure 2 7 Install 20 Rosemount CCO 5500 ...
Page 32: ...Install 24 Rosemount CCO 5500 ...
Page 88: ...Operation 80 Rosemount CCO 5500 ...
Page 98: ...Maintenance 90 Rosemount CCO 5500 ...
Page 108: ...Troubleshooting 100 Rosemount CCO 5500 ...
Page 110: ...Spare parts 102 Rosemount CCO 5500 ...
Page 122: ...Return equipment to the factory 114 Rosemount CCO 5500 ...
Page 123: ...Return equipment to the factory Reference Manual 115 ...