3
Configuration and startup
3.1
Introduction
You may need two hours or more to configure the instrument, and you need to complete
the following tasks:
•
Power up
•
Alignment*
•
Gain adjustment*
•
Set operating parameters
•
Calibration*
Note
*Perform these operations when a clean stack condition exists.
3.2
Safety considerations
The power supply unit supplies power to the analyzer system. Before removing any
equipment covers, lock out and tag out power to the supply unit.
WARNING!
ELECTRIC SHOCK
Disconnect and lock out power before connecting power to the analyzer.
3.3
Power up the Rosemount
™
CCO 5500 Analyzer
Use the following procedure to power up the analyzer.
1.
Make sure that the voltage and frequency of the AC power supply match the
required power specifications.
2.
With the AC power supply locked out and tagged off, unscrew and remove the
power supply unit cover.
3.
Select the correct power supply voltage using the AC power selector switch shown
in
Configuration and startup
Reference Manual
25
Summary of Contents for Rosemount CCO 5500
Page 4: ......
Page 8: ...Contents iv Rosemount CCO 5500 ...
Page 28: ...System Wiring Diagram Figure 2 7 Install 20 Rosemount CCO 5500 ...
Page 32: ...Install 24 Rosemount CCO 5500 ...
Page 88: ...Operation 80 Rosemount CCO 5500 ...
Page 98: ...Maintenance 90 Rosemount CCO 5500 ...
Page 108: ...Troubleshooting 100 Rosemount CCO 5500 ...
Page 110: ...Spare parts 102 Rosemount CCO 5500 ...
Page 122: ...Return equipment to the factory 114 Rosemount CCO 5500 ...
Page 123: ...Return equipment to the factory Reference Manual 115 ...