NOTICE
Rosemount
™
suggests that you tack weld the stand-off pipe to the duct and check the
alignment visually before making a complete weld.
5.
Look through one of the mounting flange assemblies.
If the you can see the orifice across the stack clearly, the alignment is satisfactory.
The alignment of these holes is not critical; an integral adjustable mount can
compensate for up to 4 degrees of misalignment.
6.
Weld the assemblies in place.
To avoid vibration and movement, you may need to fit spreader plates or bracing
fillets on the mounting flange assembly as shown in
2.5.2
Isolating valves
To protect operators, Rosemount
™
recommends that you use customer supplied isolating
valves (
) for ducts that operate at higher than atmospheric pressure. Valve
selection and installation is your responsibility.
Isolating Valve and Air Purge Arrangment
Figure 2-2:
A.
Isolating valve (customer supplied)
B.
Adjusting nuts
C.
Locking nuts
D.
Air purge port
E.
Pressure regulator assembly
F.
Rear flange
G.
Front flange
H.
Site mounting flange
Install
Reference Manual
11
Summary of Contents for Rosemount CCO 5500
Page 4: ......
Page 8: ...Contents iv Rosemount CCO 5500 ...
Page 28: ...System Wiring Diagram Figure 2 7 Install 20 Rosemount CCO 5500 ...
Page 32: ...Install 24 Rosemount CCO 5500 ...
Page 88: ...Operation 80 Rosemount CCO 5500 ...
Page 98: ...Maintenance 90 Rosemount CCO 5500 ...
Page 108: ...Troubleshooting 100 Rosemount CCO 5500 ...
Page 110: ...Spare parts 102 Rosemount CCO 5500 ...
Page 122: ...Return equipment to the factory 114 Rosemount CCO 5500 ...
Page 123: ...Return equipment to the factory Reference Manual 115 ...