D 41
6.4
Insulation monitor
The function of the protective insulation
monitoring measure must be checked
every day before starting work.
A
This check only checks the function of
the insulation monitor, not whether an in-
sulation error has occurred on the heat-
ing sections or consumers.
- Start the paver finisher's drive engine.
- Press test button (71).
- The indicator lamp integrated into the
test button signals "insulation fault".
- Press reset button (72) for at least
3 sec. to delete the simulated fault.
- The indicator lamp goes out.
f
If the test is conducted successfully,
work may be undertaken with the screed
and external consumers may be used.
If the "insulation fault" indicator lamp dis-
plays a fault even before the test button is pressed or if no fault is displayed during
the simulation, work must not be undertaken with the screed or with connected, ex-
ternal equipment.
f
The screed and equipment must be checked or repaired by a specialist electri-
cian. Only then may work again be undertaken with the screed and equipment.
f
Danger due to electrical voltage
f
Non-adherence to the safety precautions and safety regulations
when operating the electric screed heater leads to a risk of elec-
tric shock.
Danger to life.
All maintenance and repair work on the screed's electrical system may be car-
ried out by a specialist electrician only.
72
71
Summary of Contents for V5100TV-H
Page 2: ...www dynapac com...
Page 10: ...V 2...
Page 24: ...A 2...
Page 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Page 42: ...C 4 2 1 4 3...
Page 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Page 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 94: ...D 52...
Page 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 136: ...E 42...
Page 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Page 194: ...G 22...
Page 196: ...www dynapac com...