D 19
Via the temperature sensor and flame monitoring system, the electronics monitor gas
heater operation. If there is no stable flame at the ignition burner within 7 seconds,
the electronics indicate a malfunction. The gas supply is interrupted and the red indi-
cator lamps on the ignition box and in the switch cabinet light up.
A
In the event of a malfunction during the switch-on phase, the starting process can be
repeated up to three times. If the malfunction still occurs after three start-ups, the
cause of the malfunction has to be eliminated before starting again.
When the flame is correct, the screed is heated until the temperature sensors in the
individual screeds interrupt the heating process. During the heating phase, the yellow
indicator lamps on the ignition boxes (39) indicate a correct flame at the burners.
In the event of a malfunction, the red indicator lamps (33, 34, 35, 36) in the switch
cabinet and the red indicator lamps on the ignition boxes (38) indicate that the flame
at the burners is not correct.
m
The indicator lamps are important for trouble-free operation of the ignition system.
Therefore, defective bulbs should be immediately replaced!
Summary of Contents for V5100TV-H
Page 2: ...www dynapac com...
Page 10: ...V 2...
Page 24: ...A 2...
Page 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Page 42: ...C 4 2 1 4 3...
Page 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Page 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 94: ...D 52...
Page 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 136: ...E 42...
Page 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Page 194: ...G 22...
Page 196: ...www dynapac com...