F 24
10
General visual inspection
A walk around the screed with the following inspections form part of the daily routine:
- Are components or controls damaged?
- Are there leaks from the hydraulic components, etc.?
- All fastening points OK?
- Are the warnings affixed to the vehicle complete and legible?
- Are the non-slip surfaces at ladders, steps, etc. in correct condition, not worn
or
soiled?
m
Immediately take actions to correct any detected malfunction to avoid damages, dan-
gers or environmental hazards!
11
Check that the bolts and nuts fit firmly
Bolts and nuts must be checked regularly to ensure that they fit firmly; retighten them
if necessary.
A
The spare parts catalogue states the special torques at the corresponding parts.
A
For the necessary standard torques, please refer to the section "Bolts - torques"
m
Self-locking nuts are destroyed when loosened and must not be used a second time.
12
Inspection by an expert
A
Have screed and optional gas or electric system checked by a trained expert
- when required (according to the operating conditions and the nature of application),
- however, at least once a year, check that they are all in good operational condition.
13
Lubricants
13.1
Grease
A
(*) = recommended
Dynapac
Aral
BP
Esso /
Exxon
Fuchs
Mobil
Shell
Chevron
Paver
Grease
(*)
-Gadus S5
T460 1.5
-High
Temp
Premium2
Summary of Contents for V5100TV-H
Page 2: ...www dynapac com...
Page 10: ...V 2...
Page 24: ...A 2...
Page 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Page 42: ...C 4 2 1 4 3...
Page 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Page 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 94: ...D 52...
Page 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 136: ...E 42...
Page 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Page 194: ...G 22...
Page 196: ...www dynapac com...