D 4
Danger from the gas system
Incorrectly performed operation and maintenance of the
gas system can cause severe or fatal injuries!
- Only ever transport full and empty gas bottles with safety
caps to protect the bottle valves.
- Use the supplied strap retainers to secure gas bottles on
the paver finisher to prevent them from turning, tipping
over and falling down.
- Before starting the heating, check the whole heating
area for leaking gas pipes. Replaced damaged hoses
immediately.
- Close the main shut-off valves and the bottle valves
when the gas system is not in use.
- When travelling, ensure that the gas bottles from the
paver finisher are transported in another vehicle, com-
plying with the safety regulations.
- Proceed with expert inspection every twelve months.
- Only skilled workers with a corresponding qualification
are allowed to work on the gas heater system!
- Only original spare parts may be used!
- Comply with all further information in these instructions
and in the safety manual.
WARNING
Summary of Contents for V5100TV-H
Page 2: ...www dynapac com...
Page 10: ...V 2...
Page 24: ...A 2...
Page 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Page 42: ...C 4 2 1 4 3...
Page 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Page 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 94: ...D 52...
Page 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 136: ...E 42...
Page 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Page 194: ...G 22...
Page 196: ...www dynapac com...