F 6
4
Maintenance intervals – electric heating system
A
All times given are the
maximum permissible
maintenance intervals. For aggravat-
ed conditions of use,
shorter
intervals must be applied!
For the maintenance intervals and maintenance work required for the paver finisher,
refer to the operating instructions for the paver finisher.
Item
Interval
Maintenance point
Note
10
50
100
250
500
1000 / annually
2000 / every 2 years
If necessa
ry
1
q
- Check insulation monitoring
Before start-
ing work
2
A
Note national
regulations
on checking and
inspection inter-
vals!
- Electrical system check by a spe-
cialist electrician
Maintenance
q
Maintenance during the running-in
period
g
Summary of Contents for V5100TV-H
Page 2: ...www dynapac com...
Page 10: ...V 2...
Page 24: ...A 2...
Page 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Page 42: ...C 4 2 1 4 3...
Page 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Page 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 94: ...D 52...
Page 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 136: ...E 42...
Page 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Page 194: ...G 22...
Page 196: ...www dynapac com...