During operation, bitumen and fine particles enter the tamper frame. Heating keeps
them in a plastic state, thus making them available for lubricating the tamper knife.
When the screed cools down, these substances solidify. They must be liquefied by
heating before the tamper is put into operation again.
- Usually, the only cleaning work required at the end of the day is to operate the
tamper at slow speed for approx. 15 minutes and to spray some separator fluid into
the tamper compartment.
- If the tamper is not to be used for a longer period of time, the tamper compartment
should be emptied as long as the material is still in a liquid state. If necessary,
switch on the heater!
To empty the tamper compartment, the tamper deflector plates (1), (2) of the screed
parts can be loosened:
- Loosen nut (3).
- Loosen screw plug (4) a few turns at slot.
m
Ensure that the screw plug slot is positioned horizontally!
- Allow the tamper to run at low speed for a few minutes.
- Tighten screw plug (4) again.
- Tighten nut (3).
- Check gap dimension between tamper and tamper deflector plate (0.5 mm).
- If necessary, adjust the gap dimension. See chapter E.
A
Also carry out this procedure on all extension parts!
Removing the tamper deflector plates
- Loosen nut (3).
- Loosen screw plug (4) 90° at slot.
- Remove side plates (1a).
- Remove middle plates (2a).
- Swivel tamper deflector plate forwards slightly (out of screw plug) and push deflec-
tor to side out of mounting bracket.
- Reinstall tamper deflector places (1), (2) side plates (1a) and middle plates (2a) in
reverse sequence and tighten using screw plugs.
- Check gap dimension between tamper and tamper deflector plate (0.5 mm).
- If necessary, adjust the gap dimension. See chapter E.
Summary of Contents for V5100TV-H
Page 2: ...www dynapac com...
Page 10: ...V 2...
Page 24: ...A 2...
Page 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Page 42: ...C 4 2 1 4 3...
Page 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Page 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 94: ...D 52...
Page 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 136: ...E 42...
Page 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Page 194: ...G 22...
Page 196: ...www dynapac com...