D 20
4.3
Switching off the heater
After work has been completed, or when
the heater is no longer required:
- Switch off the On/Off switch (31) in the
switch cabinet.
- Close the quick action valves and both
bottle valves.
m
If these valves are not closed, there is a
danger of fire and explosion due to the
possible escape of uncombusted gas!
Always close the valves during breaks
and after work has been completed!
Gas heater side shield (
o
)
The side shields have separate flame
monitoring and separate ON/OFF
switching.
- Actuate the on/off switch (1) on the
switch cabinet; this
- opens the electromagnetic non-re-
turn valves for the gas supply to the
burners;
- activates the electronic ignition sys-
tem, causing the gas to be automat-
ically ignited by the spark plugs and
controlled by the flame monitoring
system.
A
Indicator lamp (2) indicates that the
heater is switched ON.
A malfunction is shown by the indicator
lamp (3).
31
1
3
2
Summary of Contents for V5100TV-H
Page 2: ...www dynapac com...
Page 10: ...V 2...
Page 24: ...A 2...
Page 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Page 42: ...C 4 2 1 4 3...
Page 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Page 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 94: ...D 52...
Page 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 136: ...E 42...
Page 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Page 194: ...G 22...
Page 196: ...www dynapac com...