E 1
E Set-up and modification
1
Notes regarding safety
f
Inadvertent starting of the paver finisher can endanger persons working on the
screed.
Only carry out such work with the paver finisher motor at a standstill unless the in-
structions state the opposite!
Ensure that the paver finisher is secured to prevent unintentional starting.
f
When lifted, the screed can still slide downwards if the mechanical screed transport
safeguard is not inserted on the paver finisher.
Only carry out work when the screed is secured by mechanical means!
f
When connecting or disconnecting hydraulic hoses and when working on the hydrau-
lic system, hot hydraulic fluid may spurt out at high pressure.
Switch off the engine and depressurise the hydraulic system! Protect your eyes!
Always install extension parts and conversion parts in the proper manner! If in doubt,
contact the manufacturer!
Mount all protective devices before re-commissioning the paver finisher.
The walkway must always reach over the entire working width of the screed.
The hinged walkway plate (option) may only be folded up under the following condi-
tions:
- If the vehicle has to be backed up very closely to a wall or another obstacle,
- During transportation on a low-bed trailer.
Danger due to changes at the vehicle
Structural changes to the vehicle make the operating
licence null and void and can cause severe to fatal injuries!
- Only use original spare parts and approved accessories.
- After maintenance and repair work, ensure that any dis-
mantled protective and safety devices are all completely
fitted again.
- Comply with all further information in these instructions
and in the safety manual.
DANGER
Summary of Contents for V5100TV-H
Page 2: ...www dynapac com...
Page 10: ...V 2...
Page 24: ...A 2...
Page 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Page 42: ...C 4 2 1 4 3...
Page 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Page 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 94: ...D 52...
Page 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 136: ...E 42...
Page 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Page 194: ...G 22...
Page 196: ...www dynapac com...