B 3
Lubricating system:
All important lubricating points on the main screed are com-
prised to form central distribution blocks. This system facilitates lubrication and reduc-
es the time required for maintaining the screed.
The extendable parts have individual lubricating points for the application of lubricat-
ing grease.
The automatic central lubricating system, which is available as an option, facilitates
maintenance even further, ensuring that the screed is always properly lubricated.
Screed heater:
Two different heater systems are available as options:
Gas heater:
The propane gas flame band heater features a tried-and-tested design
and is easy to handle.
The electronic temperature and flame monitoring system ensures short heating times
and constant temperatures.
Intermediate insulation above the bottom plates and the air ducts to the tamper knives
and side plates ensure efficient usage of the heat.
Electric heater:
The advantages of the electric screed heater are its tried-and-tested
design, problem-free handling and maximum possible service friendliness thanks to
maintenance-free operation.
Short heating times, constant temperatures and efficient heat utilisation are therefore
assured thanks to the various, separately monitored and controlled heating sections.
These are designed in the form of heating strips, sensibly arranged in the bottom
plates and tamper knives of each screed section.
If extension parts are fitted to the screed, only one single, easily installed plug con-
nection need be fitted to the supply and control cable leading to the neighbouring
screed component.
The heating system is monitored and controlled in the switch cabinet.
Via electrical heating of the side shields (O), adherence of mixed material is prevent-
ed and the surface texture within this area is improved.
A
Both types of heater and their operation are described in the following chapters of
these operating instructions.
Symbols are assigned to the different descriptions and figures:
- Description / depiction when equipped with gas heater
- Description / depiction when equipped with electric heater
Summary of Contents for V5100TV-H
Page 2: ...www dynapac com...
Page 10: ...V 2...
Page 24: ...A 2...
Page 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Page 42: ...C 4 2 1 4 3...
Page 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Page 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 94: ...D 52...
Page 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 136: ...E 42...
Page 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Page 194: ...G 22...