C 2
2
Transporting the removed screed
A
The procedure required to load and transport the screed
when installed
on the paver
finisher is described in the operating instructions for the paver finisher.
The screed must be retracted to the basic width. All protruding or loose parts and the
gas bottles for the screed heating system (
o
) (see Chapters E and D) must be re-
moved. Hydraulic and electrical connections must be disconnected.
f
Heed the capacity of the fork-lift truck / of the crane and the lifting gear (chains, ca-
bles, hooks, etc.)!
A
For the weights and the dimensions of the screed, refer to Chapter B, section "Tech-
nical data".
A
Gewichte und Abmessungen der Bohle siehe Kapitel B, Abschnitt „Technische Da-
ten“.
A
Secure hinged walkways to the intended
hole / strap with the corresponding
springs (1) / (2).
A
Hang the springs (1) / (2) in the provided
retaining hole (1a) / (1b) with the walk-
ways in the lower position.
2
1
2a
1a
Summary of Contents for V5100TV-H
Page 2: ...www dynapac com...
Page 10: ...V 2...
Page 24: ...A 2...
Page 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Page 42: ...C 4 2 1 4 3...
Page 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Page 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 94: ...D 52...
Page 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 136: ...E 42...
Page 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Page 194: ...G 22...
Page 196: ...www dynapac com...