B 13
5.3
Further warnings and operating instructions
*
With "gas heater" equipment only
**
With "electric heater" equipment only
No.
Pictogram
Meaning
5
**
-
Important!
Danger due to dangerous electrical vol-
tage. The machine personnel must check
the insulation monitoring every day
before starting the machine! Failure to
comply with the daily routine can cause
severe or fatal injuries.
Comply with the information in the opera-
ting instructions
6
*
-
Safety regulations for gas system!
Danger due to improper operation. The
machine must have read and understood
the safety regulations before starting the
machine! Failure to comply with the
safety regulations can cause severe or
fatal injuries.
Summary of Contents for V5100TV-H
Page 2: ...www dynapac com...
Page 10: ...V 2...
Page 24: ...A 2...
Page 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Page 42: ...C 4 2 1 4 3...
Page 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Page 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 94: ...D 52...
Page 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 136: ...E 42...
Page 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Page 194: ...G 22...
Page 196: ...www dynapac com...