F 4
2
Maintenance intervals – screed in general
Interval
Maintenance point
Note
10 / daily
50
100
250
500
1000 / annually
2000 / every 2 years
If necessary
1
q
- Lubricate tamper/vibration
bearings
2
q
- Lubricate tamper bearings of ex-
tension parts
3
q
- Lubricate vibration bearings of ex-
tension parts
4
q
- Lubricate guide tube bearings
5
q
- Clean / oil guide tubes
After
work is fin-
ished
6
q
- Lubricate crowning adjuster
7
q q
- Adjust guide tube play
8
q
- Emptying the tamper compartment
q
- Check tamper deflector plate play
q
- Adjust tamper deflector plate play
9
q
- Hydraulic hoses -
Visual inspection
q q
- Hydraulic hoses -
Replace hoses
10
q
- General visual inspection
11
regularly
- Check that the bolts and nuts
fit firmly
12
q
- Have screed checked by an expert
Maintenance
q
Maintenance during the running-in
period
g
Summary of Contents for V5100TV-H
Page 2: ...www dynapac com...
Page 10: ...V 2...
Page 24: ...A 2...
Page 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Page 42: ...C 4 2 1 4 3...
Page 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Page 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 94: ...D 52...
Page 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 136: ...E 42...
Page 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Page 194: ...G 22...
Page 196: ...www dynapac com...