4
Setting the material tunnel compressive stress ........................................35
Adjusting the tamper height ......................................................................37
Adjusting the tamper deflector plate .........................................................38
Dismantling for transportation / special operating conditions ...................41
Walkway - removable / hinged .................................................................41
Maintenance .............................................................................1
Maintenance intervals – screed in general .................................................4
Maintenance intervals – gas system ..........................................................5
Maintenance intervals – electric heating system ........................................6
Tamper and vibration bearings ...................................................................7
Other lubricating and maintenance points ................................................10
Guides of the extendable parts ................................................................11
Adjustment of guide tube play ..............................................................11
Emptying the tamper compartment ......................................................12
Removing the tamper deflector plates .................................................13
Checking / adjusting the tamper deflector plate .......................................14
Cleaning the screed with high pressure cleaners .....................................14
Marking hydraulic hoses / storage period, period of use ......................17
Injectors of the gas heater system ...........................................................20
Check insulation monitoring .....................................................................21
Insulation faults ....................................................................................22
Adjustment process when exchanging screed extension cylinder .......23
Check that the bolts and nuts fit firmly .....................................................24
Conventional version, gas heater .............................................................25
Fuses in the switch cabinet of the screed heater .................................25
Fuses (A) ..............................................................................................26
Relay (B) ..............................................................................................26
Fuses in the switch cabinet of the screed heater .................................27
Fuses (A) ..............................................................................................28
Summary of Contents for V5100TV-H
Page 2: ...www dynapac com...
Page 10: ...V 2...
Page 24: ...A 2...
Page 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Page 42: ...C 4 2 1 4 3...
Page 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Page 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 94: ...D 52...
Page 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 136: ...E 42...
Page 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Page 194: ...G 22...
Page 196: ...www dynapac com...